VolverBack

02 — CASO_DE_ESTUDIO_CASE_STUDY_

Cómo las geocercas pueden ayudarte a controlar el volumen y presupuesto utilizado en obras carreterasControlling material volume using geofences

2025Arquitectura - GeocercasArchitecture - GeofencesGEOFENCESARCHITECTUREGEOSPATIAL
022025

▦

In highway construction, jobsites are divided by stationing — specific points or kilometers along the road. The main challenge was to use that stationing to control and bound the volume of material used, keeping spend strictly inside budget.

All of this through mobile services and a simple configuration scheme that tightens payment management without slowing operations. Geofences in the mobile app identify the exact location where material is applied.

That added measurement and control by layers and control points, with finer tracking of inputs. The solution also split the job into segments and simplified setup from a single input file. Search algorithms over stationing automated data assignment and cut down manual capture by users.

Key benefits include:

  • Continuous monitoring of how material use evolves on site.
  • Precise visualization of the volume consumed.
  • Prevention of financial losses by raising alerts and blocking payment approvals when volumes were not planned.

Un acarreo recorre el cadenamiento. Dentro de cada geocerca se arma el control de volumen y el presupuesto vigila el gasto; una bandera de sobrecosto puede retener el pago.A haul moves along stationing. Inside each geofence, volume control arms and budget tracking watches the spend; an over-budget flag can hold payment.

El cadenamiento define las geocercas, el control de volumen las arma y el presupuesto mantiene el gasto honesto.Stationing defines the geofences, volume control arms them, and budget tracking keeps the spend honest.

VolverBack